Facebook
Twitter
The Renovators of Canada
We perform services to rebuild, repair, renovate and modify Residential or Commercial property.
Inspection from City Hall. The blown ceiling insulation will be inspected during the Final Inspection.
Boarding can be started after the insulation has been inspected and approved by the inspector.
At this stage get all your finishing materials brought in.
There are many different types and styles of mouldings to choose from and they come in either paint or stain grade.
If you are in a rush, the painter should paint the kitchen and bathrooms first so that cabinets can be installed.
When the Painter is finished painting the rooms where Cabinets are to be installed, the Cabinets should be delivered and installed.
Any Tile work can now be done.
The kitchen and bathroom fixtures should be installed.
In each closet you will probably want shelves and/or rods, there are many types to chose from.
The Electrician will now hang the Light Fixtures and put on the wall plates.
With some exceptions your flooring should be the last thing installed. You do not want your new floor scratched.
After all the installations are completed the finishing carpenter should finish of his work and the painter needs to come back and do the final touch-ups and repairs as required..
Final inspection is done by the building department that issued your permit and when this inspection is approved you will receive your Occupancy Permit.